日韩在线不卡观看视频|91—区二区国产好的精华液|亚洲精品综合欧美久久波多野结衣|国产xxxxx视频在线观看|国产女主播视频一区二区三区|亚洲av第二页|最新欧美亚洲中文综合在线|久久久久久久国产精品成人

Preparatory work for grid construction

更新時間:2021-02-01 10:00:33?點擊:511974 ? Grid Knowledge

The grid is a spatial structure formed by multiple rods connected by nodes in a certain grid form. At present, it is widely used in the roofs of buildings such as stadiums, theaters, exhibition halls, waiting halls, stadium stands, hangars, and two-way large-pillar workshops. Today I will tell you about the preparation work before the grid construction:

1. Check the grid support axis and elevation before the grid construction. The grid axis and elevation position must meet the design requirements and relevant standards.
2. Check the concrete strength of the support before the grid construction. The concrete strength must meet the design requirements and the current relevant standards before installation.
3. Set up full house red scaffolding, and arrange the position and elevation of each fulcrum. And design and arrange the temporary fulcrum, the location and quantity of the temporary fulcrum are confirmed by checking calculation.
4. Use jacks to adjust the height of the net frame gradually.